MEP Clash Detection Services | Clash Report Generation

Clash Detection Services for VDC Projects

We provide clash detection services and report generation services for each model – highlighting the number & types of clashes, and the details of each clash location among different trades/disciplines- Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Sprinkler, and other building management systems.

GET A QUOTE

Provide Accurate and Dependable Clash Detection Services for Design, Trade and Composite Models

Our Autodesk’s Navisworks based clash detection services identify interdisciplinary clashes or interferences for the Virtual Design and Construction (VDC) projects. We generate clash reports as per client’s requirements which include clashes between the two elements with its location, and categorize clashes as C3 (Critical), C2 (Moderate), and C1 (Low).

Our clash detection services  helps in identifying and eliminating all unacceptable clashes within the individual discipline (Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Sprinklers, Security Systems, and Others) and inter-disciplines thus making each individual model ready for composite/combined model and finally to a coordinated model which is needed for the VDC.

Our expertise and experience in BIM clash detection have equipped us with the ability to detect the critical conflicts that are deemed to have a major impact on cost and time during the on-site construction. Our clash detection services helps general contractors, construction management firms, owners to make strategic decisions for any design changes or change orders.

BIM Clash Detection Services

Clash Report Generation

Provide a clash report dashboard covering soft & hard clashes and showing progress made over the time for a gatekeeper meeting – MEP engineers, architects, general contractors, designers, and building owners.

Architectural Clash Detection

Identify Architectural clashes and generate a clash report of architectural discipline with other disciplines (Structural, Mechanical, Electrical, Plumbing, Fire Sprinklers, and others).

Electrical Clash Detection

Identify Electrical clashes and generate a clash report of Electrical discipline with other disciplines (Architectural, Structural, Mechanical, Plumbing, Fire Sprinklers, and others).

Soft & Hard Clash Detection

Identify and resolve soft & hard clashes within each discipline/trade that were unidentified during the individual design of each discipline – architectural, structural, mechanical, electrical, and plumbing

Structural Clash Detection

Identify Structural clashes and generate a clash report of Structural discipline with other disciplines (Architectural, Mechanical, Electrical, Plumbing, Fire Sprinklers, and others).

Plumbing Clash Detection

Identify Plumbing clashes and generate a clash report of Plumbing discipline with other disciplines (Architectural, Structural, Mechanical, Electrical, Fire Sprinklers, and others).

Critical, Moderate & Low Clash Detection

Identify the clashes in the 3D design that are divided into three categories depending on the importance of the design and construction project where “C” refers to Criticality – Low (C1), Moderate (C2), Critical (C3).

Mechanical Clash Detection

Identify Mechanical clashes and generate a clash report of Mechanical/HVAC discipline with other disciplines (Architectural, Structural, Electrical, Plumbing, Fire Sprinklers, and others).

Fire Sprinkler Clash Detection

Identify Fire Sprinkler clashes and generate a clash report of Fire Sprinkler discipline with other disciplines (Architectural, Structural, Mechanical, Electrical, Plumbing, and others).

Building Trades During Clash Detection

  • Mechanical System –HVAC Equipment and distribution such as Cooling tower, AHU, Ducting, etc.
  • Electrical System –Panels, switchboards, elevators, transformer, cable trays, etc.
  • Plumbing and Sanitary System –Pumps, water holding tanks, pool filtration equipment, Sump, sewage pit, grease and sand traps, etc
  • Fire Safety System – Fire sprinkler pumps, sprinkler tanks fire shutter, smoke curtains, piping system, etc.
  • Outside of Building – External works, rooftop, and external face of a building, etc.

Benefits of Clash Detection Services

With the help of Autodesk Revit and Navisworks, we help AEC professionals at every stage of design-to-construction workflow with our clash detection and MEP coordination services. With the successful experience of varied projects, we aim to facilitate this critical design process in BIM.

  • Identify the design interference before the construction process.
  • Clash detection report helps in better team collaboration between architects, structure engineers, MEP engineers, contractors and building owners.
  • It reduces the risk of human errors- thus reducing the amount of changes during construction process.
  • Achieving accurate design before the construction process can save a lot of money, time and resources.

Top 10 Causes of Clashes Found During 3D Design Coordination

Top-10-Causes-of-Clashes-Found-During-3D-Design-Coordination-by-United-BIM.
DOWNLOAD

VDC/BIM Coordination Dashboard for Gatekeeper Meeting

VDC-BIM Coordination-Dashboard-for-Gatekeeper-Meeting_Ver16Oct2020
DOWNLOAD

MEP Clash Detection Services and MEP Clash Reports

Clash report image for Plumbing to Structural disciplines by United-BIM

Plumbing to Structural Discipline

Clash report image for Mechanical to Structural disciplines by United-BIM

Mechanical to Structural Discipline

Clash report image for Electrical to Structural disciplines by United-BIM

Electrical to Structural Discipline

Clash report image for Plumbing to Mechanical disciplines by United-BIM

Plumbing to Mechanical Discipline

Clash report image between Mechanical to Electrical by United-BIM

Mechanical to Electrical Discipline

Clash report image for Plumbing to Electrical disciplines by United-BIM

Plumbing to Electrical Discipline

Let us Know About Your Clash Detection & Report Generation Requirements