NYB Expo Banner for UB_2025_for Mobile
The New York Build 2025!

THE LARGEST CONSTRUCTION & DESIGN SHOW FOR NEW YORK

United BIM is excited to showcase our expertise at the New York Build Expo 2025, the leading event for innovation in the construction and design industry. Scheduled for March 12-13, 2025, at the Javits Center, this premier platform unites 40,000+ professionals from across the AEC sector, including general contractors, architects, engineers, developers, and government representatives.

As a trusted provider of BIM services, we are proud to be part of this industry-defining event. Visit us to explore how our cutting-edge BIM solutions streamline construction workflows, enhance collaboration, and drive efficiency across every stage of the project lifecycle.

Join us at:
March 12-13, 2025
Hall 3B, Level 3,
Jacob K. Javits Convention Center, NY
Booth #1041

[imh_6310_image_map id=”1″]

ABOUT US

United-BIM Inc. is a BIM Company located in East Hartford, Connecticut providing Revit Modeling Services to Architectural, Engineering, and Construction industry professionals like Architects, Designers, Structural Engineers, MEP Engineers, General Contractors & Construction Managers, Subcontractors, Product & Equipment Manufacturers, Furniture Designers, Fabricators, Facility Managers, etc.

We are a certified SBE/MBE BIM Modeling Services Company, focused on delivering Peace of Mind and Value to clients by providing a Quality, Speed, and Consultative approach.

Sectors
12+

Years in Business

Years in Business
10+

Sectors

Projects by united-bim
1,000+

Projects

Providing BIM Revit Modeling Services with Quality, Speed, and a Consultative Approach

Our Revit BIM Modeling Services include BIM Architectural Modeling, Architectural Drafting Services, 3D Rendering Services Structural Modeling and Detailing (Rebar, Precast, others), MEP-FP Modeling and Detailing, BIM Coordination & Clash Detection Services, Revit Family Creation Services, Underground Utility Locating Services, On-site & off-site Coordination Services, Onsite & virtual meetings participation, Point Cloud Scan to BIM, CAD to BIM Services, BIM for Facility Management, Accurate Shop Drawings Creation, As-built Drawings Services, Electrical Design Services & more.

UB Brochure Mockup

OUR SERVICES

We provide clash-free coordinated 3D BIM models by resolving clashes among disciplines/trades – MEP systems, architectural and structural – leading to minimal MEP design changes/modifications. We Deliver Clash-free, Accurate and Coordinated Construction Model as per BIM Execution Plan and BIM Workflow.

We strongly believe in “Prevention is better than cure”, and that’s the guiding principle we follow in our MEP Coordination services & Clash Detection Services during key stages of building design – schematic design, design documents and construction documents.

Read More
BIM-Coordination Services by United-BIM

We provide BIM Modeling Services from the starting phase of design (SD, DD, CD) to the final construction phase. Our BIM modeling services include Architectural, Structural, MEP-FP modeling with various level of detailing (LOD 100 to LOD 500). We provide BIM modeling services to various clients across the USA such as Architectural Design & MEP Engineering Firms, Construction (GC/CM) Companies, Laser Scan Companies, Building Products, Furniture Manufacturers, and others.

Read More
BIM-Modeling Services by United-BIM

We provide clash detection services and report generation services for each model – highlighting the number & types of clashes, and the details of each clash location among different trades/disciplines- Architectural, Structural, Mechanical, Electrical, Plumbing, Fire Sprinkler, and other building management systems.

Our expertise and experience in BIM clash detection have equipped us with the ability to detect the critical conflicts that are deemed to have a major impact on cost and time during the on-site construction. Our clash detection services helps general contractors, construction management firms, owners to make strategic decisions for any design changes or change orders.

Read More
Clash-Detection Services by United-BIM

We Deliver accurate and parametric Revit Families/BIM Content in minimal file size, with Level of Detail (LOD) 100 to 500, and higher degree of visual fidelity with the required file format (.RVT, .RTE & .IFC). Our BIM modelers provide generic as well as custom Revit family creation and maintenance services to Architects, MEP Engineers, Building Product & Construction Product Manufacturers & Suppliers, Furniture Designers & Manufacturers, Equipment & Product Manufacturers & Suppliers, Facility/Asset Managers and Fabricators in the format (.rfa, .rvt, .ifc) required for spatial planning, design, cost estimation, product selection, and facility management.

Read More
Revit-Family Creation Services by United-BIM

We deliver accurate and parametric As-Built BIM Model and 2D CAD Model depicting the pipes, walls, slabs, roof planes, facades, and landscapes in and around the building. We provide models with LOD 100 to 500 to our clients covering all Architectural, Structural, MEPFP Elements along with Clash Detection for their Renovation, Refurbishment, Retrofit, or Reconstruction Projects.

We provide our Scan to BIM services (aka Point Cloud Modeling services) to Laser Scanning Companies, Surveyors, Property Owners, Architectural Design Firms, MEP Engineering Companies, and General Contractors or Construction Management companies. Our experience includes developing parametric 3D BIM and 2D CAD models capturing architectural, structural, and MEP elements for hotel, educational, and commercial projects.

Read More
Scan-to-BIM Services by United-BIM

Our capabilities for CAD to BIM Services include the conversion of AutoCAD drawings, PDFs, hand sketches, pictures, single line diagrams, and 2D or 3D DWG files to Revit  3D BIM models as per client requirements.

Our CAD to BIM Modeling Services can convert all types of drawings including architectural CAD drawings, structural CAD drawings, and MEP CAD drawings to BIM models using Autodesk’s Revit and Navisworks. Our BIM modelers take actual dimensions and design intent from the reference source files provided by clients and create collaborative information-rich BIM models for downstream processes.

Our BIM modelers can deliver efficient and accurate BIM models as per building construction codes, standards, and specifications. Our BIM experts will first understand exactly what building components the client wants in the model, and to what level of detail (LOD) each element should have.

Read More
CAD PDF to BIM Services by United-BIM

We provide construction gatekeeping services to reduce cost, schedule, and quality risks in construction projects. We provide construction gatekeeping services to general contractors, construction project managers, owner’s representatives and construction management firms by creating a BIM workflow that focuses on smooth coordination of the building design during the pre-construction and construction phase. Our team of experts carry out all the legwork required to provide peace of mind to our clients by reducing cost, schedule & quality risks in the construction project.

Read More
Construction-Gatekeeping Services by United-BIM

We provide quality electrical design services for all stages of design and construction projects to meet accurate electrical capacity and achieve low maintenance costs & fast turnover times.

Our electrical design services play a very important role in process of designing all types of buildings. Our electrical engineers can specify an installation that delivers the power required by your building while operating safely and meeting the applicable building codes and standards. Proper electrical design as per industry codes and standards is required to protect human life and to avoid any catastrophic event on-premises.

Our electrical engineers and BIM modelers have vast knowledge and experience in designing and modeling electrical systems while using the value engineering approach. This way, our team works to identify sustainable and cost-effective solutions for your project and provide ease in future operating costs and maintenance of the project.

Read More

Our private underground utility locating services accurately locate, map, and protect subsurface utilities such as fiber optic systems, gas lines, hot steam & cold water lines, and electrical systems.

Our utility locating services are specialized to building owners, facility managers, construction managers, general contractors, and sub-contractors for new construction as well as renovation projects.

Read More

OUR PORTFOLIO

Fort-Lauderdale-Aquatic-Facility-Architectural-Modeling-Services-by-United-BIM
CommercialView Projects
Architectural BIM Modeling of Luxurious Residence in Connecticut
ResidentialView Projects
Architectural-BIM Services-in-Colorado-by-United-BIM
HospitalityView Projects
Healthcare Project by United-BIM
HealthcareView Projects
Architectural Modeling Services for Industrial Project in Connecticut (2)
IndustrialView Projects
Scan to BIM Project by United-BIM
EducationalView Projects
Bloomfield-Methodist-Church-Architectural-Modeling-Services-by-United-BIM-650x400
CommunityView Projects
Federal Government
Federal ProjectsView Projects
Architecture Rendering
3D RenderingView Projects
Revit Family Creation
Revit FamilyView Projects

WHY CHOOSE US

Quality

Quality

Economics

Flexible-Staffing

Flexible Staffing

Aggresive-Schedule

Aggressive Schedules

Expertise

Expertise

Dedicated-Team

Dedicated Team

Take quick overview of United-BIM Inc

BIM Modeling SERVICES
Play

EVENT SNAPSHOTS

Glimpse of our experience at New York Build 2025! The event offered a dynamic platform to learn, network, and exchange ideas with some of the brightest minds in the industry.

New York Expo 2025
New York Expo 2025
New York Expo 2025
New York Expo 2025
New York Expo 2025
New York Expo 2025
4D & 5D BIM Services by United-BIM
We Would Love to Add Value to Your Project
Fill out the form and we'll be in touch soon!