New York BIM (Modeling & Coordination) Services – NYC

United-BIM Inc. is a leading BIM modeling company in New York offering a complete range of Building Information Modeling services, including 3D BIM modeling services, Scan to BIM, Architectural BIM and many more. We have successfully delivered over 1,000 projects across 10+ sectors throughout the USA.

Our BIM expertise spans across New York City and the NY metropolitan area, including Manhattan, Brooklyn, Queens, The Bronx, and Staten Island, as well as nearby cities like White Plains, Yonkers, New Rochelle, and Long Island.

We serve a wide range of sectors such as Hotel, Multi-Residential, Education, Commercial, Hospitals, Medical Centers, Government, Retail, Manufacturing, and Warehouse/Storage. Explore our BIM work here. This also includes GSA (General Services Administration) projects as part of our work with federal government facilities.

Company Brochure
How Can We Help You?

FILL OUT THE FORM AND WE'LL BE IN TOUCH SOON!

    Some of our BIM Projects in New York

    United BIM Exhibiting at Leading AEC Events

    We actively participate in New York’s leading AEC events, connecting with industry professionals, sharing insights, and showcasing how BIM drives smarter project delivery.

    New York Build Expo 2026 United-BIM Booth
    United-BIM at New York Build Expo stage
    New-York-Expo-2026-United-BIM-booth
    United-BIM at New York Build Expo 2026 stage 4
    New York Build 2026

    One of the largest construction and design shows in the U.S., bringing together industry leaders, innovators, and professionals across the AEC sector.

    View Highlights
    New York Expo 2025
    New York Build Expo 2025
    New York Build Expo 2025
    New York Build 2025

    A major industry gathering featuring networking, conferences, and exhibitions focused on shaping the future of construction in New York.

    View Highlights

    Projects Case Study

    Need assistance with your project? Connect with our BIM team now.Contact Us
    What We Do

    Explore our BIM Offerings in New York

    MEP Coordination of Mechanical- Electrical and Plumbing model- Hotel project by United-BIM

    BIM Coordination services in New York

    Our BIM Coordination services in New York provide a coordinated BIM model by resolving the conflicts among the trades/disciplines such as Architectural, Structural, MEP-FP, and others. As per BIM Execution Plan (BEP) and company standard, we create a construction-ready BIM model which is fully coordinated and clash-free.

    We can participate in the BIM coordination process across New York from the very start of the schematic design phase to the final construction process-thus leading to minimal design changes and change orders for the Architects and MEP Engineers

    BIM Coordination Services

    Fire Protection- Sprinklers modeling services

    BIM modeling services in New York

    We provide BIM modeling services in New York to various clients of the AEC industry, such as Architectural and design firms, MEP engineering firms, construction firms, laser scanning firms, building products, and furniture product manufacturers.

    Our BIM modeling expertise is extended across New York projects from the start of the design phase to the final construction phase with various level of detailing (LOD 100 to LOD 500) to Architectural, Structural, MEPFP models, and others.

    MEP BIM Services

    Mechanical-coordination-and-clash-detection-services-by-United-BIM

    Clash detection services in New York

    We provide clash detection services in New York to produce the clash-free and coordinated model. Our clash reports highlight the following information to resolve the clashes: clash items, clash types, locations, clash ID, and others.

    Our multidisciplinary clash detection services include Architectural, Structural, MEPFP, and others. We help the design and engineering team in mitigating design changes and change orders- thus saving time and cost during the design and construction phase.

    Clash detection services

    Revit Family Creation by United-BIM

    Revit family creation services in New York

    We provide highly accurate and parametric Revit family creation services in New York to various clients such as architects, designers, MEP engineers, building products and furniture product manufacturers, fabricators, and suppliers.

    Our Revit families are minimal in file size and can be produced at the required file format (.rvt, .rte, .ifc).

    Revit family creation services

    Scan to BIM Project by United-BIM

    Scan to BIM services across New York

    We provide Scan to BIM services across New York projects as well as to various clients such as laser scanning firms, surveyors, property owners, and architectural design firms, MEP Engineering firms, and General Contractors or Construction Management firms.

    We develop LOD 500 level of detailing to as-built 3D model and 2D CAD model depicting the architectural, structural, MEPFP, and other components and also the landscape in and around the building.

    Scan to BIM services

    Construction-Gatekeeping Services by United-BIM

    BIM Construction Services in New York

    We provide construction gatekeeping services in New York to general contractors, construction project managers, owner’s representatives, and construction management firms.

    Our BIM execution plan and BIM workflow, provide smooth onsite and offsite coordination during the pre-construction, construction, and post-construction phase.

    We provide peace of mind to our clients by helping them in mitigating quality risks, reducing costs, and proper schedule in construction projects.

    BIM Construction Services

    NYC Construction Challenges And How We Solve Them

    01

    Dense Sites & Vertical
    Buildings

    Challenge
    Crowded shafts, tight MEP zones, limited ceiling space in high-rises.

    Solution
    Precise multi-trade coordination, optimized risers, and clash-free MEP layouts.

    02

    Existing Buildings & Unreliable As-Builts

    Challenge
    Retrofits with hidden utilities and undocumented changes.

    Solution
    High-accuracy Scan-to-BIM and verified as-built models for risk-free planning.

    03

    NYC Codes, DOB Reviews & Compliance

    Challenge
    Retrofits with hidden utilities and undocumented changes.

    Solution
    High-accuracy Scan-to-BIM and verified as-built models for risk-free planning.

    04

    Trade Conflicts in Tight
    Spaces

    Challenge
    Ducts hitting beams, FP pipes blocking access, plumbing crossing conduits.

    Solution
    Early clash detection, coordinated routing, and issue tracking for zero rework

    05

    Fast Schedules & Overlapping Trade Workflows

    Challenge
    Compressed timelines common in Manhattan and the boroughs.

    Solution
    Scalable BIM teams, rapid coordination cycles, and streamlined review loops.

    06

    Cost Overruns & Material
    Waste

    Challenge
    Frequent design changes and onsite rework increasing costs.

    Solution
    Accurate QTOs, prefabrication-ready models, and optimized routing to reduce waste.

    New York BIM (Modeling & Coordination) Services

    Our BIM Offerings in New York

    United-BIM Inc. is providing BIM services in New York. Our BIM modeling and BIM coordination services have successfully completed over 1,000 projects in a variety of industries/sectors, including hotel, multi-family, education, commercial, hospital, medical centre, government, retail, manufacturing, and warehouse/storage.

    • Architectural Modeling and Drafting
    • Structural Modeling and Detailing (Rebar, Precast, others)
    • MEP-FP Modeling and Detailing
    • BIM Coordination & Clash Detection
    • Revit Family Creation
    • Underground Utility Locating
    • On-site & off-site Coordination
    • Attend on-site & virtual meetings
    • Point Cloud Scan to BIM
    • CAD/PDF to BIM
    • BIM for Facility Management
    • Accurate Shop Drawings Creation
    • As-built Drawings
    • Electrical Engineering & Design Services
    Real Results, Real Projects – Learn How We Made an ImpactBrowse Our Work

    Why Work With Us

    • Economics
    • Flexible staffing
    • Expertise
    • Aggressive schedules
    • Quality
    • Dedicated Team
    About Us
    01

    Economics

    We have seen that our customers tend to save 40-70% of their costs- hiring, training, hardware, and software cost, and other associated overhead costs.
    02

    Flexible staffing

    Some projects have to change workloads and may demand more attention. We help our clients by supplementing their temporary project requirements.
    03

    Expertise

    We have seen at times that our clients don’t have an in-house team of modelers and experts to model or do the design coordination and clash detection of their projects.
    04

    Aggressive schedules

    Our clients work on high-activity projects with aggressive deadlines and there is not enough time to bring a new team member on board, engaging United-BIM addresses the immediate project needs.
    05

    Quality

    Every project demands different expertise, at United-BIM, we have well-defined quality processes (stage-gate process) and in-house checklists that we use before we deliver work to clients.
    06

    Dedicated Team

    We provide a dedicated team that will work only for one client so our team becomes an extension of the client’s team
    350+
    HAPPY CLIENTS
    12+
    Years in Business
    10+
    Sectors
    1000+
    Projects

    NYC BIM Codes & Standards We Follow

    NYC Building Code (NYCBC)

    Ensuring compliant layouts, egress paths, fire-rated assemblies, and structural clearances.

    FDNY Fire Protection Requirements

    Accurate sprinkler zoning, standpipes, device placement, and equipment spacing.

    NYC Plumbing Code

    Correct riser routing, venting, trap sizing, and shaft coordination.

    NYC Energy Conservation Code (NYCECC)

    Envelope details, HVAC efficiencies, and lighting control compliance integrated in models.

    DOB Submission Standards

    Clean, review-ready drawings and BIM models aligned with NYC filing requirements.

    Zoning & Accessibility

    Setbacks, FAR limits, ADA/local accessibility clearances built into early-stage design.

    play video

    Providing BIM Modeling Services with Quality, Speed, and a Consultative Approach

    United-BIM Inc. is a certified SBE/MBE firm based in Connecticut. Our BIM Modeling, MEPFP Coordination, Revit Family, and Scan to BIM services deliver many benefits to Architects, Construction Contractors & Managers, Structural & MEP Engineers, Product Manufacturers, Furniture Designers, Fabricators, and Laser Scanning Companies.

    About Company

    We love to talk

    OUR BRAND PROMISE

    Deliver “Peace of Mind” and “Value” through our Quality, Speed and Consultative Approach

    LET'S TALK
    PUBLISH WHAT YOU THINK

    Latest Blogs

    Architectural Drawings Everything You Need to Know
    Architectural Drawings: Everything You Need to Know
    Architectural drawings are detailed, two-dimensional, or three-dimensional renderings that illustrate a building's design, structural elements,...
    How Electrical BIM Coordination Eliminates Cable Tray and Conduit Clashes in MEP Projects
    How Electrical BIM Coordination Eliminates Cable Tray and Conduit Clashes in MEP Projects
    Picture this: Your electrical sub has run a full rack of cable trays through Level...
    BANNER IMAGE - Understanding MEP Systems in Building Construction (Simple Explanation)
    MEP in Building Construction Explained: Systems, Workflow, and Project-Level Coordination
    A building may be structurally complete, but it is the MEP systems that make it...
    Revit vs Autocad
    Revit vs AutoCAD: Key Differences Explained for Real AEC Workflows
    The discussion around Revit vs AutoCAD is often reduced to BIM vs CAD, or new...
    FAQs