BIM Services in
United Kingdom (UK)
From BIM Execution Plans aligned with the UK BIM Framework to full MEP coordination and Revit modelling, we deliver construction-ready, ISO 19650-compliant BIM for UK architects, engineers, and contractors.
1000+
Projects Delivered12+
Years Experience10+
SectorsFILL OUT THE FORM AND WE'LL BE IN TOUCH SOON!
Your Trusted BIM Partner for UK Construction Projects
United-BIM brings 12+ years of global BIM expertise directly to the UK market. Our team is fluent in ISO 19650 workflows, the UK BIM Framework, and the specific requirements of UK public and private sector projects — from EIR/AIR preparation to CDE-compliant delivery.
All BEPs, models and documentation prepared to BS EN ISO 19650-1 & 19650-2 with UK National Annex compliance.
Dedicated UK project managers with overlapping working hours and same-day responses to all queries.
All models delivered in Revit, aligned with your CDE (ACC, BIM 360, Viewpoint) and project naming conventions.
BIM Services Tailored for UK Projects
Every service is delivered to ISO 19650 standards with UK-specific terminology, workflows, and documentation formats.
Pre- and Post-Contract BEPs aligned with ISO 19650-2, incorporating EIR/AIR responses, responsibility matrices, and project information standards.
Revit-based architectural models for RIBA Stages 2–5, delivering construction-ready documentation including planning drawings, technical drawings, and specifications.
Multi-discipline MEP coordination across mechanical, electrical, plumbing, and fire protection to BSRIA/CIBSE standards, with Navisworks clash reports.
Revit Structure models for concrete, steel, and timber frame buildings, integrated with structural analysis and connected to architectural federated models.
Navisworks-based clash detection with prioritised reports, resolution logs, and weekly coordination meeting support for design teams and contractors.
Accurate as-built Revit models from laser scan / point cloud data for refurbishment, extensions, and heritage projects — LOD 300–500 delivery.
Strategic BIM advisory for organisations adopting ISO 19650 — covering policy, templates, MIDP/TIDP, CDE setup, and team training.
Construction-ready shop drawings, spool drawings, and installation layouts extracted from coordinated BIM models for UK subcontractors and fabricators.
Construction programme sequencing (4D) and quantity take-off / cost estimation (5D) from BIM models, supporting UK contractors’ tender and planning submissions.
Aligned with UK BIM & Information Management Standards
The UK BIM landscape is defined by ISO 19650, the UK BIM Framework, and the Building Safety Act. We understand every layer and deliver accordingly.
ISO 19650-1
Defines the overarching information management framework. All our processes are structured around the appointing party / appointed party model.
ISO 19650-2
Governs BEP preparation, MIDP/TIDP, CDE workflows, and information delivery milestones. Our BEPs follow this structure precisely.
UK BIM Framework
Since 2025 rebranded as the IMI Framework, extending information management across the full asset lifecycle including operations.
Building Safety Act
We support Golden Thread requirements for higher-risk buildings, ensuring digital records are maintained and transferable throughout the asset life.
UK-Compatible CDE Platforms
We work natively within the platforms your team already uses:
- Autodesk Construction Cloud (ACC)
- BIM 360 / Docs
- Viewpoint / 4Projects
- Procore
- Asite
UK Sectors We Work Across
Experience across the full breadth of UK construction sectors, from residential towers to NHS healthcare estates.
How We Deliver Your Project
A structured, ISO 19650-aligned delivery process- transparent at every stage from brief to handover.
01
Project Brief & EIR ReviewWe review your Employer’s Information Requirements and project scope.
02
BEP & MIDP PreparationPre-contract BEP, delivery plans, and CDE protocol agreed with your team.
03
Modelling & CoordinationRevit models built to agreed LoIN, with weekly coordination and clash reports.
04
QA Review & CDE UploadInternal QA checks, then model and document upload to your CDE environment.
05
Handover & Golden ThreadFinal as-built model, O&M data, and Golden Thread documentation delivered.
Why Clients Choose United-BIM
Our team is trained in the full ISO 19650 series and the UK National Annex — no learning curve, no upskilling required on your project timeline.
Offshore delivery with onshore quality management. Get the same Revit expertise and ISO compliance at a fraction of in-house or UK consultancy rates.
Dedicated UK-facing project managers available during your working day. No waiting overnight for responses or file deliveries.
Scale up from 1 Revit technician to a full coordination team within days. No contracts, no overhead — just resource on demand.
Delivered across healthcare, residential, education, commercial, and infrastructure sectors globally, with UK project experience included.
Our Client
Need ISO 19650-Compliant BIM or Your UK Project?
From BIM Execution Plans to construction-ready MEP coordination, we support UK architects, engineers, and contractors with structured Revit deliverables aligned with the UK BIM Framework./p>
Yes. All our BIM Execution Plans follow BS EN ISO 19650-2 with the UK National Annex. They include MIDP, TIDP, responsibility matrices, CDE protocols, and Level of Information Need specifications aligned with your EIR/AIR.
Absolutely. We work natively within Autodesk Construction Cloud (ACC), BIM 360, Viewpoint/4Projects, Procore, Asite, and other major UK CDE platforms. We follow your naming conventions and folder structures from day one.
A pre-contract BEP can typically be completed within 5–10 business days depending on the complexity of the project and the detail within the EIR. For urgent tender submissions we offer expedited turnaround — contact us to discuss.
Yes. For higher-risk buildings (HRBs) under the Building Safety Act 2022, we prepare and maintain the digital Golden Thread — ensuring all design, construction, and O&M information is structured, attributable, and transferable across the asset lifecycle.
We assign dedicated UK-facing project managers who are available Monday to Friday during GMT/BST business hours. You will always have a responsive point of contact during your working day. Production teams work a shift that enables overnight delivery of model updates.
We work across all current Revit versions (2022–2025) and will always work within your specified version. We can adopt your existing Revit template, shared parameters, and view templates — or create UK-compliant templates from scratch if required.
We offer both. Fixed-price engagements for defined scopes such as BEP preparation or modelling to a specific RIBA stage. Monthly retainers for ongoing coordination support. We'll recommend the right structure after understanding your project.
Yes. We regularly onboard onto projects mid-flow. We'll conduct a model audit, agree the handover protocol, and get up to speed quickly. Most teams are operational within 3–5 business days of instruction.





















