Phone: (860) 317-7105 | Email: info@united-bim.com
United-BIMUnited-BIMUnited-BIMUnited-BIM
  • HOME
  • SERVICES
    • BIM Outsourcing
      • BIM Services
      • Scan to BIM
      • PDF or CAD to BIM
      • VDC & BIM Coordination
      • Structural BIM
      • Rebar Detailing & Modeling
      • Precast Modeling and Detailing
      • BIM for FM
      • BIM Consulting
      • BIM as per CT, DAS
      • Underground Utility Locating
    • ARCHITECTURAL Outsourcing
      • Architectural BIM
      • Architectural Drafting
      • 3D Rendering
    • MEP Outsourcing
      • MEP Modeling
        • MEP Drafting Services
        • Mechanical/HVAC Modeling
        • Electrical Modeling
        • Plumbing Modeling
        • Fire Protection Modeling
      • BIM Coordination
        • Mechanical/HVAC Coordination
        • Electrical Coordination
        • Plumbing Coordination
      • Clash Detection
      • Electrical Design Services
    • CONSTRUCTION Outsourcing
      • Construction Gatekeeping
      • 4D BIM – Construction Simulation
      • 5D BIM – Cost Estimation
      • LOD 400 Modeling
      • Shop Drawings
      • Quantity Takeoff
    • REVIT FAMILY Creation Outsourcing
      • BIM Object Creation
        • Building Product Manufacturers
        • Equipment & Product Manufacturers
        • Furniture Manufacturers & Designers
      • BIM Content Creation Services
  • Sectors
    • Data Center
    • Federal / Government
    • Commercial
    • Hospitality
    • Healthcare
    • Residential
    • Educational
    • Infrastructure
  • PROJECTS
    • Portfolios
      • Commercial
      • Residential
      • Hospitality
      • Healthcare
      • Industrial
      • Educational
      • Community
      • Retail
    • Case Studies
  • ABOUT US
    • About United-BIM
    • Pricing
    • Our Clients
    • Our Team
    • Why Outsource BIM Modeling
    • Delivery Models
    • Careers
    • Events and Expo
      • AU 2026 | Las Vegas
      • New York Build 2026
      • New York Build 2025
      • AIA25 Exhibitor Boston
      • CACX 2022
      • CACX 2021
      • CACX-2019
  • RESOURCES
    • Blogs
    • Press Releases & News
    • Services Brochure
    • Downloadable Checklists
    • Downloadable Infographics
    • Downloadable Blogs
    • Videos
    • Infographics
    • Quotes
    • Art Gallery
    • Social Buzz
  • Contact Us
GSA 4D BIM ServicesUnited BIMOctober 30, 2024January 9, 2025

United-BIM-Logo

United-BIM Inc

For AEC, Through BIM, UNITED-ly

Our brand promise is to deliver Peace of Mind and through our commitment to Quality, Speed, and a Consultative Approach.

Contact Info
Address: USA - 60 Darlin Street, Suite 202, East Hartford, CT 06108
Phone: (860) 317-7105
Email: info@united-bim.com
D-U-N-S® Number: 081321190

Our Global Presence
  • USA
  • Australia
  • UK
Our BIM Services
  • BIM Services
  • MEP BIM
  • MEP Coordination
  • Architectural BIM
  • Scan to BIM
  • 4D Scheduling
  • CAD to BIM
  • BIM Consulting
  • Clash Detection Services
  • 3D Rendering
  • Revit Family Creation
  • 3D BIM Modeling
ISO/IEC 27001:2022 Certified

UNITED-BIM’s ISO/IEC 27001:2022 certified ISMS supports secure BIM modeling services through controlled assets, technologies, and delivery processes.


United-BIM ISOIEC 270012022 Certified
United-BIM Inc : Terms and Privacy Policy
© 2026 United-BIM Inc.
Our site uses cookies. By continuing to our site you are agreeing to our cookie and privacy policy
GOT IT

FILL OUT THE FORM AND WE'LL BE IN TOUCH SOON!