Project Overview
United-BIM developed an as-built BIM model and coordinated MEP model for a healthcare facility project in Florida. The model captured existing architectural conditions, major MEP systems, patient areas, service corridors, utility rooms, ceiling zones, and equipment spaces.
The BIM model helped the project team verify existing conditions, plan MEP upgrades, review ceiling and service zones, and reduce coordination issues before renovation documentation was finalized.
- SectorHealthcare / Medical Facility
- Service OfferedScan to BIM | MEP BIM Coordination | Construction Documentation
- Tools / SoftwareAutodesk Revit, Autodesk Recap, Navisworks Manage
- Building ConfigurationMulti-Level Healthcare Facility with Patient Areas, Service Corridors, Utility Rooms, Ceiling Zones, and Equipment Spaces
- SQFTApprox. 125,000 sq. ft.
Project Overview
| # | Challenge | Solution |
|---|---|---|
| 1 | Existing drawings did not fully reflect current field conditions. | Converted point cloud data into an accurate as-built Revit model for renovation planning. |
| 2 | MEP systems had to be reviewed around patient areas, ceilings, service corridors, and equipment spaces. | Coordinated mechanical, electrical, plumbing, and fire protection routes within the BIM model. |
| 3 | Ceiling spaces had limited room for ducts, piping, conduits, and access panels. | Used model-based coordination to review service zones, access clearances, and routing conflicts. |
| 4 | The project team needed reliable documentation before renovation work moved ahead. | Generated coordinated model views, plans, sections, and documentation outputs from the BIM model. |
| 5 | Multiple design updates had to be managed without losing model consistency. | Maintained a structured Revit model with clear discipline separation and regular coordination updates |
Looking for BIM services for your next Project?
FILL OUT THE FORM AND WE'LL BE IN TOUCH SOON!
Brands We’ve Worked With
“United-BIM helped us understand the existing facility conditions and coordinate MEP upgrades with more confidence. The model gave our team a clearer base for renovation planning.”
Project Manager
Private Construction Company, Florida